Laars SC 12 - Install and Operating Manual Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Bojler Laars SC 12 - Install and Operating Manual. LAARS SC 12 - Install and Operating Manual User Manual [it] [de] [fr] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 0
Laars Sequencing Controls
Document 4200
LINE
NEUT
OUTPUT 8
OUTPUT 9
OUTPUT 7
OUTPUT 10
OUTPUT 11
OUTPUT 12
INCREMENT
AUTO
OFF
LEAD STAGE
ROTATION
SELECT
SETTING
UP
DOWN
INPUTS
1 2 3
4
5 6 7
8
9
10
SAFETY
GROUND
MUST BE
CONNECTED
11
12
Sensor Com Shield + Sensor Com
Dry Contact
Only
Dry Contact
Only
TEMP
SHUTDOWN
/SETBACK
PROVE
/DHW
SYSTEM
Output 7
OFF
AUTO
ON
Output 8
OFF
AUTO
ON
Output 9
OFF
AUTO
ON
Output 10
OFF
AUTO
ON
Output 11
OFF
AUTO
ON
Output 12
OFF
AUTO
ON
OFF
AUTO
ON
OUTPUT 1
OUTPUT 2
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
Output 1
OFF
AUTO
ON
Output 2
OFF
AUTO
ON
Output 3
OFF
AUTO
ON
Output 4
OFF
AUTO
ON
Output 5
OFF
AUTO
ON
Output 6
OFF
AUTO
ON
System
LEAD
OUTPUT ON
4-20 ma
OUTDOOR
SC
Non-Modulating
Model SC6, SC6P
and SC 12
Output panel to Sequence
up to 12 individual
manual override capabilities
Installation and Operation Instructions
FOR YOUR SAFETY:
This product must be installed and serviced by a
professional service technician, qualifi ed in hot water heater/boiler controls
installation and maintenance. This manual is intended for anyone who will
install, operate or maintain the control system. Before you begin installation
and operation of this control, it is important that you thoroughly review this
manual. Improper installation and operation could result in damage to
equipment and possibly even personal injury. Laars Sequencing Controls are
not intended for use as operation safety limit controls. Another control, which
is intended and certifi ed as a high limit control, must be in the boiler/heater
control circuit.
Przeglądanie stron 0
1 2 3 4 5 6 ... 27 28

Podsumowanie treści

Strona 1 - Laars Sequencing Controls

Laars Sequencing ControlsDocument 4200LINENEUTOUTPUT 8OUTPUT 9OUTPUT 7OUTPUT 10OUTPUT 11OUTPUT 12INCREMENTAUTOOFFLEAD STAGEROTATIONSELECTSETTINGUPDOWN

Strona 2 - Contents

Page 10LAARS Heating SystemsADJUSTING THE CONTROL SETTING• After the power up routine is complete, the display will show the system water temperatur

Strona 3 - SC FUNCTION CHART

Page 11Laars Sequencing ControlsSET POINT CONTROL WITH OSS SEQUENCINGDip Switch 8 - OFFPress SELECT ButtonDISPLAY Press and hold either the UP or DOWN

Strona 4 - DIP SWITCH CHART

Page 12LAARS Heating SystemsOUTDOOR RESET WITH NORMAL SEQUENCINGDip Switch 6 and 7 - OFF and 8 - ONPress SELECT ButtonDISPLAY Press and hold either th

Strona 5 - INSTALLATION

Page 13Laars Sequencing ControlsOUTDOOR RESET WITH OSS SEQUENCINGDip Switch 6 and 7 - OFF and 8 - ONPress SELECT ButtonDISPLAY Press and hold either t

Strona 6

Page 14LAARS Heating Systems♦ Additional output relays can be ordered separately (CA002300). Each active Stage Output must have a relay.WARNINGThis L

Strona 7 - WARNING

Page 15Laars Sequencing ControlsSC-6P OUTPUT WIRINGINSTALLING THE OUTPUT RELAYS ♦• Each OUTPUT which is to be used must have a relay installed in the

Strona 8 - Outdoor Reset Control

Page 16LAARS Heating SystemsBoiler 3 Boiler 2 Boiler 1Output 1Output 2Output 3OutdoorSensorSystemTemperatureSensorSystemPumpDHWDry Contact(optional)SC

Strona 9

Page 17Laars Sequencing ControlsOUTPUT RELAY CHARTS6 Stage Sequencer - SC 62 3 4 5 6 1 2 3 1 2 1On/Off On/Off On/Off On/Off On/OffLo/Hi Lo/Hi Lo/Hi 3

Strona 10 - ADJUSTING THE CONTROL SETTING

Page 18LAARS Heating SystemsOPERATIONSET POINT CONTROL SETTINGSSET POINT (SP) Default: 70°F• The Set Point is the temperature value th

Strona 11 - Press SELECT

Page 19Laars Sequencing ControlsOUTDOOR RESET SETTINGSCALCULATED (CAL)• This is the water temperature the SC will stage units to hold. It is based o

Strona 12 - LSH applies in that case

Page 2LAARS Heating SystemsContentsSC FUNCTION CHART . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 13

Page 20LAARS Heating SystemsOFFSET (OFS) Default: 0°F• The Offset value moves the starting point of the Reset Ratio curves (see charts on the

Strona 14 - SC-6 and SC-12 OUTPUT WIRING

Page 21Laars Sequencing ControlsPURGE TIME (Pt) Default: 0 minutes• Many units must go through a purge cycle before they are brought on lin

Strona 15 - SC-6P OUTPUT WIRING

Page 22LAARS Heating SystemsSYSTEM OUTPUT SETTINGSSYSTEM DELAY (Sd) Default: 0minutesSC-6 or SC-12• In Combustion Air Damper mode (Dip Swi

Strona 16 - LAARS Heating Systems

Page 23Laars Sequencing ControlsFIRST ON/FIRST OFF ROTATION• For this type of rotation, dip switch 5 must be in the ON position.ON position.ON• On p

Strona 17 - OUTPUT RELAY CHARTS

Page 24LAARS Heating SystemsSHUTDOWN• This feature allows the user to shutdown all Stage Outputs on the SC from a remote location.• A typical use of

Strona 18 - OPERATION

Page 25Laars Sequencing ControlsDHW CALL• When the DHW terminals are closed, the SC Set Point immediately changes to 200°F. This will happen regardle

Strona 19 - OUTDOOR RESET SETTINGS

Page 26LAARS Heating SystemsTROUBLESHOOTINGNo Display, or Display of 888 Check the 120VAC power input to the SC. Turn power to the SC off and back o

Strona 20 - NORMAL SEQUENCING SETTINGS

Page 27Laars Sequencing ControlsThere are more than one green lead stage lights on Check the 120VAC power input to the SC. Turn power to the SC off

Strona 21

800.900.9276 • Fax 800.559.1583 (Customer Service, Service Advisors)20 Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.33551869 Sisme

Strona 22 - LEAD STAGE

Page 3Laars Sequencing ControlsSC FUNCTION CHARTLINENEUTOUTPUT 8OUTPUT 9OUTPUT 7OUTPUT 10OUTPUT 11OUTPUT 12INCREMENTAUTOOFFLEAD STAGEROTATIONSELECTSET

Strona 23 - EXTERNAL SET POINT

Page 4LAARS Heating SystemsDIP SWITCH CHART1 2 3 4 5 6 7 8ONSwitch 1System OutputSwitch 5RotationSwitches 6 and 7Input Type5First On/Last OffLead stag

Strona 24 - SHUTDOWN

Page 5Laars Sequencing ControlsINSTALLATIONMOUNTING THE SC• Select a location near the equipment to be controlled.• The surface should be fl at, and

Strona 25 - DHW CALL

Page 6LAARS Heating SystemsExternal Set Point - Terminals 4, 5, and 6• The SC can accept a 4-20mA signal from an Energy Management System (EMS) or ot

Strona 26 - TROUBLESHOOTING

Page 7Laars Sequencing ControlsWIRING THE STAGE OUTPUTS• For SC-6 and SC-12 see pg. 14.• For SC-6P see pg. 15.WIRING THE SYSTEM OUTPUTCombustion Air

Strona 27

Page 8LAARS Heating SystemsPOWER UP SEQUENCES• Whenever the SC is powered up, it displays the software version number and then the operating paramete

Strona 28

Page 9Laars Sequencing Controls• The Minimum Water Temperature can be adjusted from 110°F to 180°F.• To change the minimum water temperature, hold d

Komentarze do niniejszej Instrukcji

Brak uwag